Friday, March 8, 2013

Footings and forms

Once the blasting was over, the loose debris was dug out and the basement area flattened out.  The forms for the footings were then contructed which took several days plus an inspection before the concrete is poured. 
Front of the garage--we will have two separate doors.

Standing where the front porch will be looking down into basement.

Looking East here--laundry room and mud room directly in front of us.  You can see the basement bath and bedroom in the far footings plus where the stairs will be. 


View from the top again on the rocks.  Garage is to the right.

Basement level now--we will have 9 foot ceilings here so that is why we had to blast the rock out. 

Theater room in the far corner and bedroom/bath to the right/front. 