Friday, June 28, 2013

More exterior Paint, Power Meter box mounted, and more fans





 Electrical meter box got mounted today--now we can paint to match the house.
 Painting continued today around the whole house for the base color. 


 Heli putting his stamp on the job
 Maddies tub and plumbing all ready to go now. 
 Panasonic bath fan--nice and quiet plus powerful with the squirrel cage design

 You can see the radiant floor heating on the ceiling for the bath room floors above
Lots of ladders!  One side of the house the 40 foot ladder was needed. 

Wednesday, June 26, 2013

Pine Pollin, Exterior Paint starts



 MMMMM....pine pollin is in season! 
 Maddie checking out the flowers
 Started painting today--lots to do with angles and trim work, but the spraying makes it quick. 


 still working on brush removal too.

 Part of the front done also...

 You can see the mitigation work I have done--much better now and plenty of firewood! 
 Front porch is also finally trimmed out and ready for paint
 Can lights mounted...


And, the main panel is almost wired up. 

Sunday, June 23, 2013

Sunset at the new house on the divide and electrical panel




 Added the rear porch plates on also--we will have a small deck and then stone patio off of that. 
 Main panel went in the garage today.  Added some conduit for future pulls to garage attic.
 Garage switches and lights...plenty of them! 

 Sunset tonight was excellent


 Hard to beat! 


Hey there Maddie! 

Thursday, June 20, 2013

Electrical almost done,



 Wires everywhere! 


 Garage and bonus area electrical finished
 Maddie and Luna playing
 A couple of pics of the house from all sides to show the current look.  We are ready for paint outside now.





 These are directional can lights for pictures--you just rotate them--pretty cool. 
 Kitchen wiring almost ready
 Kitchen island pendant lights