Tuesday, August 20, 2013

Interior Painting, electrical hookup, water working and the Generator is delivered!

Painting commenced on the interior doors--lots of caulking to do and taping of course too.  

 Hardware also showed up for all the doors.  Nice feel to it--Amy did a great job!


 Maddie racing us to the house each night. 
 Lots more wood too--spent a good part of the weekend cutting and Amy used the ATV to move it around to the front so we can split it all and restack. 
 Generator showed up..UPS freight. 
 Temp wire hook up to run the water pump down stairs.
 Does it need to be that big?  :) 
 Backup starter battery and the automatic transfer switch--plenty more wiring to do.  ATS has 16 circuits so plenty of circuits will be covered in the house. 
 Two coats of paint on most of the doors now. 




 The machine that makes it all happen and keeps your back in tact!

 Meter is installed out side--and temp power pole turned off.  Meter reads 1 KWH...never see that really!
 Maddie showing me how she can use the stick to reach something to high for her. 
 No lights yet but the water pressure tank is the blue tank up behind the studded wall and has been all hooked up by the well company.  Testing water now for hardness, potability, etc...
 The stairwell/entry.  Really coming out nice!
Staining the handrails in the family room--this was over the weekend--toxic so we stayed out of the house--that made the saw cutting much easier and dedicated! 