Saturday, April 20, 2013

First Floor Exterior and Interior walls framed up and ready for beams.

 We all walked up to the house today to see the progress on the first floor.  Today the framers were able to get all the walls done on the first floor.  We had to re map the pantry area in the kitchen and move a few interior walls to make the fridge doors open correctly.  All worked out thanks to Jeff meeting up with us and measuring it all up. 
 Lots of lumber but lots of walls too!
 My mom and Dad came up and looking out the dining room window with Madeline
 Mom and Madeline checking out the family room. 
 Madeline looking out the family room front window--say HI!
 Gubby and Madeline pretending to eat at the dining room table. 
 My dad checking out the carpentry work.  Giving it that experienced eye look!
 Let me out!
 Gubby and Madeline checking out the basement. 

 View from the front up to the first floor walls.
 We climbed into the basement so Madeline could get a better look. 
 Bedroom window here with Heli checking it out. 
 Basement bath and folks are at the stair well location
 You can see the crawl space now and the entrance to it just above Amy's head. 
 Madeline trying to get Heli in the basement.
 Support beam and pole
 Dad with Madeline about to climb out. 
 Theatre room area
 This is an office area with the mechanical room at the back end--you can see the pipes coming out of the ground. 
 Madeline from above!
 Hi again! 
 Amy and Heli check out the future front door and porch.
 View from above with everyone at the back window. 

 Overlook of the floor plan right now. 
Now, ready to hike back and have some dinner.