Today the crane showed up to install the trusses on the garage and top floor. Madeline and Amy met me at the house to take a gander at how it went. Exciting to really see the shape of the house/roof now!
They started with the top floor--at the master bath/master room first
Then they did the front bedroom #3 next
They had a second rope on the trusses to keep them from spinning as they were lifted.
Lots of coordinating with the crane operator and ground crew plus framers.
Finishing up the front bedroom
Amy and Madeline inside take a look around the family room
Walking through the hallway to the mud room
Garage trusses going into place--we have bonus room trusses here above this space--will be nice for the climbing wall area and some extra storage. Long day for the guys working--we dropped off a back country pizza and case of beer to wrap things up. The pizza maybe lasted 5 minutes...