Another blue bird day in construction. Snow, blue bird, snow, well, you get the idea.
Garage really taking shape. Left door and then the side entry door plus the door to the shop off the garage is visible.
Looking from garage into basement
Mechanical room area
Future water conduit for detached garage
Crawl space and you can see the drain tile is in below the landscape material. Also added the rubber waterproofing coating to the outside of the walls.
Plumbing actross the basement floor heading to the settling tank.
Front porch footings and supports
Basement bathroom and bedroom--there will be windows on either side here.
Basement bath room plumbing
Septic exit from basement under footings to the tank down the hill.
Large view of the basement--ready for inspection and then radiant floor heat/slab pouring.