Never made it back yesterday to wrap up the garage roof but the roofers are coming this week to put down the first layer of the TPO felt on the roof. So, Amy headed up with me and we got out the 8 foot ladder and I made up the long handled shovel again. We were able to reach most of the snow from below this time.
Just about got it all.
A few pics from the inside with the new windows. This is the Master bedroom
2nd bedroom
2nd Bath upstairs
Master Bath
Heli guarding the entry way
Master toilet room
The bathtub will be in this corner
Front Bedroom
The drill truck showed up also--they will start drilling the well this week sometime.
Laundry Window
Dining and Family room windows
Kitchen window and dining window
Another family room shot--both front/back windows. A fireplace and shelves goes in the back wall
Mud room entrance from Kitchen. Pantry to the right and powder room to the left.
Front entry and stairwell
Mud room looking in to the garage
Garage windows up high
Bonus room windows are in now too. We MAY get to our the basement and garage slabs this week if the weather holds. Just have to see. I am working hard on the low voltage wiring now and getting the materials all ordered for that so I can put that in maybe two weeks from now. The plumber and Electricians will also be on site during that time. Moving right along!