Today the garage front was sided a bit and the first 42 feet of well were drilled to install the casing.
Big truck! here the steel casing is installed already and has been cemented in. You can see it at the bottom of the tower.
Here you can see the drilling bit on the ground to the left.
Here you can see the drilling bit on the ground to the left.
Maddie was checking out the truck again. Very loud when drilling running that big engine on the back of the rig.
Tomorrow they will drill and see what happens. Ideally we want at least 2GPM coming out and a good static rate. The 42 feet of steel casing keep the ground water out of your well water.
You can see the front wall to the garage is sided now and they started doing the wrap on the doors
Better angle of the side of the garage. Tomorrow, the garage doors and back will probably be done.