They retested the well today and the results were excellent--7gpm.
Running the flow test. Frank and Adam of Smith Drilling were on site to make this all happen. Great guys and I work with Adam at Eldora--small world.
Picking out floors and cabinets. We went with Cherry cabinets and Acacia hardwood floors.
I helped Jeff roll up the extra grid that was in the basement after he laid the Insulation and grid so we can fasten the radiant heat pipes down. Slab should be poured next Friday finally!
After they lined the well with 4 inch PVC, Adam and Frank capped it and packed up the rig.
So, not much happening over the weekend with siding or anything else--possibly the plumbers coming on site to lay the basement floor pipe down.