Thursday, May 23, 2013

Prepping the garage for Slab Work

The Concrete folks were back on site to run the re-bar for the basement and garage.




 Siding work continues...
 Maddie checking things over. 



Basement Radiant Heating is in and ready for slab.  We marked out all of the rooms with paint



 Mechanical area where all the loops start.

 Stairway to top.

Here is the garage people door stoop.  Simple box frame to get us a small slab.